This project involved the complete demolition of an existing movie theatre and the conversion into gymnasium. Extensive structural work was required including the removal of a load-bearing wall and second floor mezzanine, and several sloped floors had to be in-filled. All new electrical, mechanical, and plumbing systems were installed. Restrooms were relocated and lockers and showers added. All new finishes were added/replaced, including electrical fixtures, flooring, millwork, and paint, all according Planet Fitness design standards.